"Just want to thank you and everyone else on getting the Advantech HMI for #2 valve balancer up and running. These are critical machines for the parts they make for the assembly lines. I, as well as everybody else, appreciates the effort put into making this happen.
On the harsh, cold lakeshore and a frigid (-14), Don Maxon and I pulled up to the Sanford Lake Dam to pick up a 22 ton rotor from a 1,375 KVA turbine generator. It is one of three generators that were installed in the the 1920's - and the FIRST to go bad!